Knowledge Base

Back to Location Module


Slope XIX Rock Fill Slope

Updated July 27, 2022


This article applies to:
  • RoadEng Civil
  • RoadEng Forestry

Slope XIX Rock Fill Slope 

Stacked rock fill on keyed in at toe. Add before other components.

Typical Cross Section

Rock Fill Slope.png

Parameters

  RoadSGwidth Road subgrade width.
  RockFillSlope Fill slope of rock.
  ExtraWidthAtToe Extra Horizontal Width For Rock Fill at Toe
  RockFillThickness Thickness Of Rock Fill Slope
  KeyInDepth Depth to key in material at toe.
  KeyInCutSlopeOut Outside excavation slope to key in rock fill.
  SlopeOfExcFloor Slope of excavation floor.
  KeyInCutSlopeIn Keyed in cutslope inside.