Typical Cross Section

Parameters

Pipe_DiameterPipe Diameter
PBMDPipe Bedding Material Depth (beneath the penstock to bottom of trench)
Trench_BWHalf the trench bottom width.
Trench_CSSCut slope.
SFCDSelect fill cover depth.
SFSSSelect fill side slope.
SFTWSelect fill minimum top width.
CFCDCommon fill cover depth.
CFSSCommon fill side slopes.
CFTWCommon fill top width.
CF_top_slopeSlope of common to encourage runoff.
Bank_widthBank width (if in fill)
Bank_fill_SSOutside slope of bank
road_offsetvertical dist from road to Centerline of pipe